1 HOUR

90 MIN

  • 90 Minute Fire Rated Ceiling Hatch

    Plasterboard / Lightweight Installation
  • 90 Minute Fire Rated Ceiling Hatch

    Masonry / Concrete Installation
  • 90 Minute Fire Rated Wall Hatch

    Plasterboard / Lightweight Installation
  • 90 Minute Fire Rated Wall Hatch

    Masonry / Concrete Installation
  • 90 Minute Fire Rated Wall Hatch

    64mm Speedpanel Installation
  • 90 Minute Fire Rated Wall Hatch

    75mm Hebel Installation

2 HOUR

We can also produce a 4hr Fire Rated Hatch - Walls. Please contact us for further information.

Fyreguard access hatches have been tested and assessed to meet Australian standardAS 1530.4 and provide FRL’s from -/60/60 -/240/120.

  • Australian made
  • Custom made sizes
  • Flanged or Set Bead
  • Simple Installation

Also known as Fire Rated Access Manholes in some states of Australia.